23-24 Jun 2011
EEA 2011 Conference
Oct. 26-27, 2010
PowerFactory Seminar - 'DSL and Control System Modelling'
Melbourne
Feb. 01-02, 2011
PowerFactory Seminar - 'PowerFactory Basic Training'
Melbourne
Feb. 08-09, 2011
PowerFactory Seminar - 'PowerFactory Protection Analysis'
Melbourne
DIgSILENT Pacific was engaged by Norman Disney and Young (NDY), to complete the stability analysis of the co-generation plant for the Good's Shed building in the Melbourne CBD. The building includes four Capstone 65 kW microgenerators. These units run asynchronously to the distribution system as they are connected to the AC system through an AC/DC/AC converter. The study showed that the contribution of the converter system to the distribution system fault level is minimal. As the system is asynchronous, transient angle stability for the generation is a non issue. Other aspects of the connection study included:
DIgSILENT Pacific has expertise in co-generation stability and grid connection studies. For more information contact us at our Melbourne or Perth offices.